• +63 2 7796 4717 / +63 917 311 4717 / +63 920 956 2156
  • CALL US NOW
Flooring Solutions

  • Home
  • About Us
  • Industry
  • Our Solutions
    • Epoxy Flooring
    • Raised Flooring
    • Concrete Repair
    • Polyurethane Flooring
    • Waterproofing Products
    • Concrete Grind and Seal
    • Methyl Methacrylate Resin Flooring
  • Brands
    • Valto Engineered Materials
    • Euclid Chemicals
    • Flowcrete
    • Jotun Philippines
    • Mapei
    • Tremco
    • Vandex
    • Vebro Polymers
  • Projects
  • Blogs
    • Industrial Kitchen Flooring Philippines
    • Penetrating Sealers Davao
    • Anti-Slip Flooring Davao
    • Construction Chemicals Davao
    • Concrete Repair Davao
    • Polyurethane Mortar Davao
    • Self-Leveling Epoxy Price Davao
    • Waterproofing Contractor Davao
    • Waterproofing Davao
    • A Professional Look into Polyurethane Flooring in the Philippines
    • Advantages Of Using Epoxy Resin In The Philippines For Your Flooring
    • Polished Concrete Philippines: A Stunning Interior Style
    • The Basics of PU Flooring
    • What You Need to Know About Epoxy Flooring
    • Why You Need High-Performance Cold Storage Flooring in the Philippines
    • What Are The Best Types of Industrial Kitchen Flooring in the Philippines?
    • Waterproofing Contractor Philippines
    • Flooring Solutions: Your One Stop Shop For Polyurethane Mortar In The Philippines
  • Careers
  • Contact Us

Terms and Conditions:

By making a payment through our online payment facility, the Client acknowledges and agrees to the following Terms and Conditions of International Industry Partners Inc. (IIPI) / Flooring Solutions Philippines:

1. Quotation and Scope of Work

All payments shall be subject to the corresponding approved quotation, purchase order, contract, or other written agreement between the Client and IIPI. The products, services, quantities, specifications, project scope, and exclusions shall be based on the approved quotation or contract. Items not expressly included, such as line markings, logos, pedestrian lanes, or other additional works, shall be charged separately unless otherwise specified.

2. Payments

Payments made through our online payment facility may be applied to down payments, progress or partial billings, and full or final payments for products and services provided by IIPI.

Payment through the online facility does not, by itself, constitute acceptance of additional work or modifications outside the approved quotation or contract.

3. Mobilization and Work Schedule

Mobilization and the project work schedule shall be agreed upon after receipt of the applicable purchase order or contract and/or required down payment and shall be subject to material availability and site readiness.

4. Project Delays and Additional Mobilization

Additional mobilization costs from the project site to the IIPI warehouse and vice versa may be charged to the Client in the event of a work stoppage or interruption that is not attributable to IIPI.

Any reasonable incidental costs arising from delays, interruptions, or circumstances not attributable to IIPI may likewise be charged to the Client, subject to the applicable quotation or contract.

5. Client-Provided Site Requirements

Unless otherwise agreed in writing, the Client shall provide IIPI, free of charge, reasonable access to electricity, water, storage or warehouse space, parking, and an appropriate work or office area at the project site as necessary for the performance of the work.

6. Project Documentation

IIPI may take photographs and videos of the project site before, during, and after the performance of the work for project documentation.

Subject to applicable confidentiality arrangements and privacy requirements, such photographs and videos may also be used to document completed projects and milestones on IIPI's website, digital platforms, print materials, and other marketing channels.

7. Excess Materials

Unless otherwise expressly stated in the approved quotation or contract, any excess or unused materials supplied by IIPI and remaining at the project site shall remain the property of IIPI.

8. Completion and Acceptance

IIPI may issue a Certificate of Completion and Acceptance (COCA) for partial progress or completed work. The Client or its authorized representative shall sign the COCA as acknowledgment of the completion, acceptance, and turnover of the applicable work.

Upon turnover or acceptance of the finished work, the Client shall be responsible for its proper protection and preservation, subject to the applicable warranty terms.

9. Completion and Acceptance

To the extent permitted by applicable law and subject to the terms of the applicable contract, IIPI's aggregate liability arising from a particular project shall not exceed the total purchase amount paid or payable to IIPI for that project.

10. Payment Confirmation

A successful payment transaction confirms only the receipt or processing of payment. It does not amend the project's scope, price, specifications, schedule, warranty, or other terms contained in the approved quotation, purchase order, or contract.

Payments shall be considered properly credited once the transaction has been successfully confirmed and reconciled with IIPI's records.

11. Governing Project Documents

These online Terms and Conditions supplement, and do not replace, the specific terms contained in the Client's approved quotation, purchase order, contract, or other written project agreement with IIPI.

In the event of a conflict concerning the specific scope, pricing, payment schedule, warranty, or technical requirements of a project, the terms of the applicable signed or approved project document shall govern, subject to applicable law.

12. Acceptance of Terms

By proceeding with payment, the Client confirms that they are authorized to make the payment and acknowledges that they have read, understood, and agreed to these Terms and Conditions, together with the applicable quotation, purchase order, contract, or other project agreement.

Privacy Policy

International Industry Partners Inc. (IIPI) / Flooring Solutions Philippines respects and protects the privacy of our clients. We collect and process only the personal and business information necessary to process payments, fulfill orders, provide our products and services, communicate regarding projects and transactions, and comply with applicable legal and regulatory requirements. Information provided to us will be handled securely and will not be sold or shared with third parties except when necessary to process transactions, provide our services, comply with legal requirements, or when authorized by the client. Online payments may be processed through third-party payment service providers, which may collect and process payment information in accordance with their own privacy and security policies.

By providing your information and using our services, you acknowledge and consent to the collection and processing of your information for the purposes stated above. For privacy-related questions or requests, you may contact International Industry Partners Inc. through our official contact channels.

Return and Refund Policy

Down payments are made to confirm the Client's order or project and may be applied toward the procurement or allocation of materials, manpower scheduling, mobilization, and other project-related preparations. Once materials have been ordered, allocated, customized, or delivered, or project preparation and mobilization have commenced, the down payment shall be non-refundable, except where otherwise required by applicable law or expressly agreed upon by IIPI in writing.

For progress, partial, or full payments covering products delivered or services and works that have already been completed, rendered, and accepted by the Client, such payments shall be final and non-refundable. Any concerns regarding workmanship, defects, or warranty claims after project completion shall be handled in accordance with the applicable quotation, contract, Certificate of Completion and Acceptance (COCA), and warranty terms, rather than through a refund of the payment.

By proceeding with payment, the Client acknowledges and agrees to this Return and Refund Policy.

Flooring Solutions

Flooring Solutions Philippines is made up of a team of resin flooring experts who will guarantee you nothing but the best. We provide alternative solutions for your epoxy, polyurethane, MMA, waterproofing, and protective coatings for your flooring needs. Expect dependability, swift installations, and a comfortable customer experience with us and get started on your flooring project today!

QUICK LINKS

  • HOME
  • ABOUT
  • INDUSTRY
  • OUR SOLUTIONS
  • PROJECTS
  • BLOGS
  • TERMS & CONDITIONS

CONTACT

  • +63 2 7796 4717
    +63 917 311 4717
    +63 920 956 2156

  • Civic Prime Building 2501 Civic Drive Filinvest, Alabang, Muntinlupa, Metro Manila


  • Cebu Satellite Office/Warehouse:
    AL Supply, Tagunol, 122 Highway Cebu City


  • Davao Satellite Office/Warehouse:
    Malagamot Rd. Panacan, Davao City


  • Facebook YouTube

Copyright © 2026 Flooring Solutions | SEO by SEO-Hacker. Optimized and maintained by Sean Si.